Copyright 2017
All rights reserved.
Signage
Client: New Museum Of Contemporary Art
Role: Electrical Engineering, System Design, Project Management
I constructed the original LED signage for the New Museum Of Contemporary Art, which was in place from 2008 to 2016. It was 80% transparent, had an integrated website for programming the text. I engineered the LED product and power and data distribution boards, designed the system, managed the project, and designed the control website.